From the outside the house is really looking good, with the siding and trim nearing completion. The siding/trim should be complete next week and the decking construction should start within the next couple of days. Banker Norm is doing another inspection today and we are slowly turning our attention to the interior details (faucets, flooring, etc.).
Thursday, October 9, 2008
Wednesday, October 1, 2008
Tuesday, September 23, 2008
Cedar Shake Siding
Friday, September 19, 2008
Roof
The roof, windows and doors have been completed. There are no hurricanes currently brewing, but we should stay dry inside from this point forward. Plumbing has been roughed in, and the HVAC, electrical and siding are next on the agenda.
Friday, September 12, 2008
Windows
Friday, September 5, 2008
The Calm Before the Storm(s)!
Hanna, Ike and who knows who are coming for a visit. We're not talking about Hannah Montana (missing an "h") or Ike Turner (he's dead!). Nope, we're talking about hurricane season! Dennis says we are structurally sound and as ready as we can be to take whatever Mother Earth decides to dish out. Windows and plumbing are being installed, and the roofer is putting down the protective coating that goes on before the roof shingles. Wish us luck as we watch the storms roll in during the next few weeks.
Monday, September 1, 2008
Labor Day Visit
Carolee and I spent Labor Day weekend in Buxton. We met Dennis and Alita for a tour of the house Saturday morning and followed that with some shop talk regarding the great room layout. Apple uglies were on the breakfast menu Sunday morning after a run for Carolee and a bike ride for me. We also met with the Dennis and Trent (the electrician) for 3 hours on Sunday to go over lights, switches, fans, etc. We had great weather and were able to spend a lot of time at the beach. Casey (our Aussie) made her first trip to the beach and only had one wave get her the entire weekend!